Project controls has run on the same tools for thirty years.
We rebuilt the whole discipline around AI.
Same forensic rigour. Ten times the speed. A fraction of the cost.
AI does the heavy reading, linking and number-crunching. Senior planners do the judgment — and sign every output.
A fully logic-linked, resource-loaded P6 baseline from your contract, BOQ and drawings. DCMA-14 checked, submission-ready.
FlagshipThe entire correspondence record — hundreds of letters, MOMs, notices — read, mapped to the programme and cited. Window analysis, TIA, EOT.
EOT · RebuttalsQSRA and QCRA on the live schedule. Monte Carlo, P50/P80 confidence, tornado drivers, costed mitigation scenarios — refreshed each update.
Monte CarloClaimed vs earned verified against WIRs and inspection records. Update audits before you certify a single percent.
Update auditsValue-of-work-done forecasting, cash-flow and value engineering, reconciled to the live programme and actuals.
ForecastingWeb Gantt, S-curves, trackers and board packs — always current, in the browser, no licences.
No licencesEverything below feeds it. Everything beside it comes out of it.
We rebuilt every workflow around AI — the machine does the heavy reading, linking and number-crunching. Our senior planners do the judgment.
Expert-in-the-loop, always. AI accelerates the work — it never replaces professional judgment. Every baseline, claim and risk model is reviewed and signed off by senior planning engineers before it reaches you.
Built straight from your P6 files and site records — anonymised sample below, live on every engagement.
Live earned-value tracking against the baseline — refreshed with every schedule update, not once a month.
Weighted progress rolled up from WIRs, submittal logs and the live programme.
Your XER parsed by our P6-Bridge pipeline into an interactive web Gantt — filter, trace logic, compare baselines in the browser.
Headline indices with drill-down to the WBS element driving each variance.
Programme phasing turned into sequence imagery — zone-by-zone build-out your board can read at a glance, animated from the live schedule.
Duration-ranged on the live schedule, so P50/P80 dates move with reality.
The whole project on a single page — KPIs, curve, critical milestones and narrative. Auto-refreshed for every board pack.
| ID | Risk | P×I | Score | Trend | Owner |
|---|---|---|---|---|---|
| R-014 | Marine works interface delays substructure access | 4×5 | 20 | ▲ | Contractor |
| R-021 | Shop-drawing approval cycle exceeds 14-day code | 4×4 | 16 | ▬ | Engineer |
| R-007 | Long-lead switchgear delivery slips past L2 milestone | 3×4 | 12 | ▼ | Contractor |
| R-032 | Summer productivity dip on external works | 3×3 | 9 | ▬ | PMC |
| R-011 | Authority NOC renewals lapse at phase gates | 2×3 | 6 | ▼ | Employer |
Every risk mapped to programme activities and costed — feeding the Monte Carlo model directly.
Whatever happens on site becomes structured data — and structured data becomes decisions.
Drag to explore →
480,000 m² · USD 1 billion — the world's largest archaeological museum.
Five towers incl. an 80-storey landmark · USD 1 billion.
69 buildings, waterfront retail district.
663 villas · AED 2.94 billion.
Plaza Pavilion works, Parcel G.
Twin 46-storey towers · AED 1 billion.
204-villa development.
Beachfront leisure development.
Jumeirah Village Triangle tower.
Contract, BOQ, drawings in. Fixed price out — within hours.
AI reads the full document set and structures the scope.
Logic-linked, resource-loaded P6 build. DCMA-14 quality gate.
Senior planner sign-off. Submission-ready baseline in your inbox.
Send the scope. The 48 hours start when you hit send.